{"id":6468,"date":"2025-12-05T08:45:25","date_gmt":"2025-12-05T08:45:25","guid":{"rendered":"https:\/\/www.smartouch.com.sg\/post\/?p=6468"},"modified":"2025-12-10T08:46:06","modified_gmt":"2025-12-10T08:46:06","slug":"bca-submission-service-singapore-hassle-free-bas-epss-compliance-for-your-building-projects","status":"publish","type":"post","link":"https:\/\/www.smartouch.com.sg\/post\/bca-submission-service-singapore-hassle-free-bas-epss-compliance-for-your-building-projects\/","title":{"rendered":"BCA Submission Service Singapore: Hassle-Free BAS &amp; ePSS Compliance for Your Building Projects"},"content":{"rendered":"<div class=\"smart-adver\" style=\"margin-left: auto;margin-right: auto;text-align: center;\" id=\"smart-968762805\"><script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-1806286982415317\" crossorigin=\"anonymous\"><\/script><ins class=\"adsbygoogle\" style=\"display:block;\" data-ad-client=\"ca-pub-1806286982415317\" \ndata-ad-slot=\"\" \ndata-ad-format=\"auto\"><\/ins>\n<script> \n(adsbygoogle = window.adsbygoogle || []).push({}); \n<\/script>\n<\/div>\n<p class=\"wp-block-paragraph\">In Singapore, the <strong>Building and Construction Authority (BCA)<\/strong> has very clear expectations when it comes to how buildings are monitored and how energy performance is reported. For many owners, developers, M&amp;E consultants and system integrators, the administrative and technical workload behind <strong>BCA BAS &amp; ePSS submissions<\/strong> can feel overwhelming.<\/p><div class=\"smart-advertise\" style=\"margin-left: auto;margin-right: auto;text-align: center;\" id=\"smart-861832200\"><script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script>\r\n<!-- Advertisement -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-1806286982415317\"\r\n     data-ad-slot=\"3480965656\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n(adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">File formats, data structures, trend logs, mapping points from Building Automation Systems (BAS), portal uploads, clarifications with BCA officers\u2014each step has to be done correctly or projects risk costly delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is where a professional, technology-powered <strong>BCA submission service in Singapore<\/strong> becomes invaluable. With the right partner, organisations can hand over the complexity of BAS and ePSS submissions and focus on completing projects on time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our dedicated <strong>BCA BAS &amp; ePSS solution<\/strong>, which you can explore here:<br>\ud83d\udc49 <a href=\"https:\/\/smartouch.com.sg\/bca-bas-epss-solution\/?utm_source=chatgpt.com\">https:\/\/smartouch.com.sg\/bca-bas-epss-solution\/<\/a><br>is designed precisely for this purpose\u2014removing guesswork, minimising errors and helping you meet BCA requirements smoothly and efficiently.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Understanding BCA BAS &amp; ePSS Requirements in Singapore<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before looking at the service, it helps to understand the two key pillars:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. BAS (Building Automation System) Data for BCA<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">BCA requires buildings to provide standardised BAS information so that:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Energy usage and plant performance can be evaluated<\/li>\n\n\n\n<li>Key systems\u2014like chillers, AHUs, pumps and meters\u2014are properly monitored<\/li>\n\n\n\n<li>Buildings meet efficiency and operational benchmarks<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This means your BAS must:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Trend specific points at defined intervals<\/li>\n\n\n\n<li>Export data in compatible formats<\/li>\n\n\n\n<li>Provide consistent, validated readings over time<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. ePSS (Energy Performance Submission System)<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">ePSS is BCA\u2019s framework for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Submitting building energy performance data<\/li>\n\n\n\n<li>Supporting audits and compliance checks<\/li>\n\n\n\n<li>Enabling long-term benchmarking across buildings<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">To be accepted, your ePSS submission must be structured, complete and aligned with BCA\u2019s specifications. Any mismatch in data, missing fields or wrong structures can lead to rejection or rework.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A specialised <strong>BCA submission service Singapore<\/strong> solution aligns BAS and ePSS so that these two components work together as one coherent compliance package.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Why Companies Struggle with BCA BAS &amp; ePSS Submissions<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Many project teams and facility owners face common pain points:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Technical complexity<\/strong> \u2013 BAS points, trend logs and data exports often require specialised knowledge.<\/li>\n\n\n\n<li><strong>Formatting issues<\/strong> \u2013 Files may not match BCA\u2019s templates or naming conventions.<\/li>\n\n\n\n<li><strong>Time pressure<\/strong> \u2013 Submissions are usually needed alongside ongoing project work and commissioning.<\/li>\n\n\n\n<li><strong>Limited internal resources<\/strong> \u2013 Engineering teams are already busy with design, installation and testing.<\/li>\n\n\n\n<li><strong>Trial-and-error submissions<\/strong> \u2013 Without experience, teams may submit multiple times before getting it right.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These issues increase project risk. Delays in BCA approval can affect:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>TOP \/ CSC timelines<\/li>\n\n\n\n<li>Green Mark and sustainability targets<\/li>\n\n\n\n<li>Handover to building owners<\/li>\n\n\n\n<li>Revenue and operational schedules<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Our <strong>BCA submission service<\/strong> is built to remove these risks and give you predictable, professional results.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Our BCA Submission Service Singapore: What We Deliver<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Our <strong>BCA BAS &amp; ePSS solution<\/strong> provides an end-to-end service that covers everything from data extraction to final submission.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. BAS Data Collection and Point Mapping<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">We work with your BAS integrator or facility team to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Identify all BCA-required monitoring and control points<\/li>\n\n\n\n<li>Configure trend logs and time intervals as required<\/li>\n\n\n\n<li>Ensure points are named and structured consistently<\/li>\n\n\n\n<li>Extract data from your BAS in ready-to-process format<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This ensures that the raw data going into the submission is accurate and aligned with BCA\u2019s expectations.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. Data Validation and Quality Checks<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Bad or incomplete data is one of the most common reasons for submission delays. Our service includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Checking for missing readings and gaps in trend logs<\/li>\n\n\n\n<li>Validating units, ranges and data formats<\/li>\n\n\n\n<li>Spotting abnormal values for investigation<\/li>\n\n\n\n<li>Confirming that logging duration meets BCA requirements<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">By fixing problems before submission, we significantly reduce the risk of queries and rejections.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. ePSS File Preparation and Structuring<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For the <strong>ePSS portion<\/strong>, we:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Prepare energy performance datasets based on BAS logs and metering<\/li>\n\n\n\n<li>Map data into ePSS-compliant structures and templates<\/li>\n\n\n\n<li>Classify energy usage according to system types (e.g. chiller plant, lighting, plug loads)<\/li>\n\n\n\n<li>Make sure all mandatory fields and supporting information are present<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The result is a fully structured ePSS submission package ready for upload.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4. BCA-Ready Formatting and Documentation<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond raw data, BCA expects clarity and consistency in:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>File names and labelling<\/li>\n\n\n\n<li>Data groupings (zones, systems, equipment)<\/li>\n\n\n\n<li>Document metadata and timestamps<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Our <strong>BCA submission service Singapore<\/strong> ensures that:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>All files follow BCA\u2019s latest template and naming standards<\/li>\n\n\n\n<li>Trend logs and summary files are organised logically<\/li>\n\n\n\n<li>Supporting documentation is packaged in a clean structure<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This professional preparation helps BCA officers review your submission faster.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>5. Portal Upload and Submission Handling<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">We don\u2019t stop at file preparation. Our service also covers:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Uploading all required files onto the BCA submission platform<\/li>\n\n\n\n<li>Verifying upload completeness<\/li>\n\n\n\n<li>Tracking submission status<\/li>\n\n\n\n<li>Managing resubmissions if BCA requests changes<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Project teams are kept informed but do not need to handle the technical side of the process.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>6. Liaison with BCA for Clarifications<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If BCA officers request:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Clarifications on specific points<\/li>\n\n\n\n<li>Additional data or alternative formats<\/li>\n\n\n\n<li>Explanations of unusual readings<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">our team supports you by:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Interpreting BCA feedback<\/li>\n\n\n\n<li>Adjusting data or files accordingly<\/li>\n\n\n\n<li>Providing technical explanations based on BAS behaviour<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This reduces pressure on your internal team and keeps communication consistent and professional.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Key Benefits of Using Our BCA Submission Service in Singapore<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. Faster, Smoother Approvals<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">With experience from multiple projects, our team understands:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>What BCA typically looks for<\/li>\n\n\n\n<li>Common mistakes to avoid<\/li>\n\n\n\n<li>Best practices for structuring BAS and ePSS files<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This know-how translates into fewer rejections and quicker approvals.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>2. Reduced Workload for Your Engineering and FM Teams<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Instead of spending hours:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Exporting logs<\/li>\n\n\n\n<li>Manually cleaning spreadsheets<\/li>\n\n\n\n<li>Experimenting with formats<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">your engineers can focus on system performance, commissioning and operation. We handle the submission workload for you.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. Lower Risk of Compliance Issues<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Mistakes in BCA submissions can have serious consequences:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project timelines shifted<\/li>\n\n\n\n<li>Additional site visits or re-testing<\/li>\n\n\n\n<li>Strained relationships between owner, consultant, contractor and authorities<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Our service helps you avoid these risks by delivering submission packages that are carefully validated and compliant.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4. Professional, Repeatable Submission Process<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once we establish a submission structure for your building or portfolio, you can:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reuse frameworks for future submissions<\/li>\n\n\n\n<li>Apply consistent standards across multiple projects<\/li>\n\n\n\n<li>Make recurring regulatory reporting far easier to handle<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This is particularly useful for organisations with many sites or ongoing upgrade programmes.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>5. Support for Green Mark and Sustainability Goals<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Accurate BAS and ePSS reporting directly supports:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>BCA Green Mark certification<\/li>\n\n\n\n<li>Internal energy management programmes<\/li>\n\n\n\n<li>ESG (Environmental, Social, Governance) reporting<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">By providing clean, structured data, our solution helps you demonstrate performance improvements and compliance with sustainability frameworks.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Who Should Use a Professional BCA Submission Service?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Our <strong>BCA submission service Singapore<\/strong> is ideal for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Building owners and developers<\/strong><br>Ensuring their assets are compliant and ready for handover or operation.<\/li>\n\n\n\n<li><strong>M&amp;E consultants<\/strong><br>Who want a reliable partner to handle the technical details of BAS\/ePSS submissions.<\/li>\n\n\n\n<li><strong>BAS and control system integrators<\/strong><br>Looking to offload the documentation and data preparation workload.<\/li>\n\n\n\n<li><strong>Facility management companies<\/strong><br>Responsible for ongoing regulatory reporting across multiple properties.<\/li>\n\n\n\n<li><strong>Contractors handling design-and-build projects<\/strong><br>Who must satisfy BCA requirements within tight project schedules.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Whether you manage a single building or a large portfolio, outsourcing the submission process can significantly improve reliability and efficiency.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How Our BCA BAS &amp; ePSS Solution Works Step-by-Step<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A typical engagement follows these stages:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Initial Review<\/strong><br>We discuss your project scope, building systems and BCA submission timelines.<\/li>\n\n\n\n<li><strong>BAS System Assessment<\/strong><br>We review BAS configuration, available points and existing logs to identify gaps against BCA requirements.<\/li>\n\n\n\n<li><strong>Configuration &amp; Data Collection<\/strong><br>Where needed, we help configure new trend logs or monitoring points and then gather the required datasets.<\/li>\n\n\n\n<li><strong>Data Cleaning &amp; Mapping<\/strong><br>Raw data is cleaned, validated and mapped into BCA-compliant structures for both BAS and ePSS components.<\/li>\n\n\n\n<li><strong>File Packaging &amp; Documentation<\/strong><br>The full submission package is created, labelled and checked carefully before upload.<\/li>\n\n\n\n<li><strong>Portal Submission &amp; Follow-Up<\/strong><br>We submit the package via the BCA portal and manage follow-up queries, adjustments and confirmations.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Throughout the process, your team stays updated with clear progress reports and final documentation.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Why Partner with Us for BCA Submission Service Singapore?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Choosing the right partner for BCA compliance can make a major difference to project outcomes. With our solution, you benefit from:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Deep experience<\/strong> with BAS, energy monitoring and BCA expectations<\/li>\n\n\n\n<li><strong>Proven workflows<\/strong> that have been applied across multiple buildings<\/li>\n\n\n\n<li><strong>Technical knowledge<\/strong> covering automation, metering and data logging<\/li>\n\n\n\n<li><strong>End-to-end support<\/strong> from consultation to final approval<\/li>\n\n\n\n<li><strong>A future-ready approach<\/strong>, suited for recurring or portfolio-wide submissions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">We focus on making BCA submissions predictable, manageable and stress-free for all stakeholders.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Start Simplifying Your BCA BAS &amp; ePSS Submissions Today<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As regulations tighten and building systems become more complex, handling BCA submissions manually is no longer sustainable. A dedicated <strong>BCA submission service in Singapore<\/strong> helps you:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Avoid submission errors and delays<\/li>\n\n\n\n<li>Reduce internal workload and frustration<\/li>\n\n\n\n<li>Improve compliance confidence<\/li>\n\n\n\n<li>Support long-term energy and sustainability goals<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">To find out how our BCA BAS &amp; ePSS solution can support your current or upcoming projects, visit:<br>\ud83d\udc49 <a href=\"https:\/\/smartouch.com.sg\/bca-bas-epss-solution\/?utm_source=chatgpt.com\">https:\/\/smartouch.com.sg\/bca-bas-epss-solution\/<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We are ready to work alongside your team to deliver smooth, accurate and fully compliant BAS and ePSS submissions to BCA\u2014every time.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">Smart Touch technology pte ltd , <a href=\"http:\/\/www.smartouch.com.sg\">www.smartouch.com.sg<\/a> +65-63964767, <a>sales@smartouch.com.sg<\/a> , <a href=\"http:\/\/www.smartouch.com.my\">www.smartouch.com.my<\/a> +607-3889903 <a>sales@smartouch.com.my<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Singapore, the Building and Construction Authority (BCA) has very clear expectations when it comes to how buildings are monitored and how energy performance is reported. For many owners, developers, M&amp;E consultants and system integrators,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":6219,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6468","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/posts\/6468","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/comments?post=6468"}],"version-history":[{"count":1,"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/posts\/6468\/revisions"}],"predecessor-version":[{"id":6469,"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/posts\/6468\/revisions\/6469"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/media\/6219"}],"wp:attachment":[{"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/media?parent=6468"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/categories?post=6468"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smartouch.com.sg\/post\/wp-json\/wp\/v2\/tags?post=6468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}